From enquiry to fully charged — here's exactly what happens

EV chargers are all we do. Five steps from your first enquiry to a properly installed home charger.

A-Grade licensed
Free site assessment
Upfront pricing
CES included same day
Same-day response
EV charger specialists

Five steps, zero surprises

EV charger installation is all we do — which means we've done this hundreds of times. We've simplified the process so there are no surprises, no jargon, and no chasing us for updates.

1

Request your free quote

Fill in our form with your suburb, EV make and model, and the type of charger you're after. It takes 90 seconds and there's no commitment.

What to have handy: Your EV model, roughly when your home was built, and whether you have a garage or carport.
2

We email you same day

We'll review your details and email you same day with clear, upfront pricing for your suburb and setup. No call-out fee. No obligation. Just a clear number so you know exactly what to expect.

What we'll ask: Garage or carport? Where's your meter box located? Any solar panels installed? These help us give you an accurate quote without any on-day surprises.
3

Book your installation

Once you're happy with the quote, we'll lock in a date and time that suits you. Most installations across Tarneit, Truganina, Hoppers Crossing and Craigieburn can be booked within the same week.

Tesla Wall Connector owners: Make sure your unit arrives before installation day. Order direct from Tesla — we handle all electrical installation once it's on site.
4

Installation day — what to expect

Our electrician arrives at the agreed time and carries out a brief site check before starting. Most standard installations take 2–4 hours.

  • Confirm switchboard capacity and available circuits
  • Run a dedicated circuit from switchboard to charger location
  • Mount and wire the charging unit
  • Load test the circuit and verify charging rate
  • Walk you through how to use it before we leave
Power interruption: We'll need to isolate your switchboard briefly — usually 15–30 minutes. We'll give you advance notice so you can save anything important.
5

Certificate of Electrical Safety — issued same day

Once installation is complete and tested, we issue your Certificate of Electrical Safety on the day. In Victoria this is a legal requirement for all electrical installation work.

Keep this document. You'll need it for home insurance and when you sell the property. We issue it digitally so you have it immediately.
What's included

No surprises. No add-ons.

Free site assessment

We assess your switchboard, meter location and parking setup before quoting. You know exactly what's needed before committing to anything.

All materials included

Cable, conduit, circuit breaker and fittings — all included in your quote. No surprise supply charges on the day.

Certificate of Electrical Safety

Issued same day by our A-Grade licensed electrician. Required by Victorian law for all electrical installation work.

Full installation test

Every installation is load-tested before we leave. We confirm your EV is charging at the correct rate.

Not included: Switchboard upgrades are quoted separately if required — we always identify this during the free assessment and tell you upfront before any work begins.
Common question

Do I need a switchboard upgrade?

Most Melbourne west homes built after 2000 don't need one. Here's the breakdown:

Probably don't need one
  • Home built after 2000
  • Modern circuit breaker board installed
  • Safety switches (RCDs) already present
  • Home in Tarneit, Truganina, Wyndham Vale estate
  • Solar already running without issues
Might need one
  • Older ceramic fuse board (pre-2000 home)
  • No spare circuit capacity in board
  • Older home in Hoppers Crossing, Werribee
  • Also adding solar or pool pump
Level 2 home EV charger installed — Melbourne
Ready to book?

Same-week availability across Melbourne's west

Fill in the form above and we'll get back to you same day. Most installations can be booked within the week.

Get a free quote →